At the beginning of this month we were working in the Port of Antwerp. We supplied the hoisting equipment for moving a hosetower there. Eventually several trucks with equipment (own weight of 40T) left our workshop for the job.
The hosetower is hanging below:
– 2x modular lifting beam of 400T on 14m
– 2x modular lifting beam of 250T on 15m
– 2x modular lifting beam of 110T at 9.5m
– 2x modular lifting beam of 110T at 9m
– 8x modular lifting beam of 50T on 5m
– 48 slings
– 80 shackles