Archives: Case Studies
Installing a Cyclotron
July 7, 2019
Location Belgium, Leuven The challenge Both the weight of the cyclotron (55T) and the location, bunker not accessible from above by crane, were a challenge for our client.Weighing a Ship
July 7, 2019
Location Netherlands, Krimpen aan den Ijssel The challenge In November 2018 we were able to help weigh a yacht at the shipyard of the Buijs brothers in Krimpen aanEurope’s Largest LED Cube
July 8, 2019
Location Germany The challenge Ledcon was commissioned by Hisense, one of the main sponsors of the 1st league Schalke 04, to build the new LED cube for the VeltinsAssisting in placing 2.500T floodgate
August 6, 2019
Location Belgium The challenge In Belgium, a major renovation is underway at the Pierre Vandamme lock, the entrance to the inner port of Zeebrugge. Part of the renovation wasStator removal at Rugeley Power Station
September 13, 2019
Location Ridderkerk, Netherlands and Rugeley, UK Our colleagues in the UK received the request to remove a stator from a decommissioned power plant in Rugeley. This operation was preceded byLifting a 48T bridge on to a pontoon
February 6, 2020
Location Netherlands The challenge The Steenhuisenbrug (a 48T bridge) is being refurbished and that’s not happening on site. The bridge will be disconnected and replaced by a temporary pedestrian bridge.Frame at an angle
May 8, 2020
THE CHALLENGE Our client was commissioned to lower a number of tubes with a plastic casing into a drill pipe at an angle of 32.5 and 37.5 degrees. The challengeLifting of a bridge
June 22, 2020
Place A lot of infrastructure work is currently underway in Germany and we are also contributing with our equipment and know-how. This is also the case in Hamburg, where ourFlying high with the modular spreader beams from LGH!
January 5, 2024
We are pleased to report on an exciting project we were recently involved in in the picturesque harbour city of Marseille. Our team at LGH had the pleasure of supplying